Hot New Arrivals:Anti-Microbial&Lightweight Footwear
Hot New Arrivals:Anti-Microbial&Lightweight Footwear Hot New Arrivals:Anti-Microbial&Lightweight Footwear
Home Brogue Shoes Anti-Microbial Brogue Shoes
Troy Lee Designs FLOWLINE SE Helmet with MIPS - Gray

Troy Lee Designs FLOWLINE SE Helmet with MIPS - Gray

$ 31.85

$ 0.00

Save: $

Size:
  • XS/S
  • M/L
  • XL/XXL
Unavailable
Please select combo product attributes
The combo subtotal is $,SAVE$

Product Details

Troy Lee Designs FLOWLINE SE MIPS Helmet Radian Camo - Gray Army/Green

The all-new Flowline SE Helmet is handpicked, literally, by the pros and for good reason. The Flowline SE Helmet features all the same marquee accolades as the Flowline Helmet including an NTA 8776 E-Bike Certification and Virginia Tech 5-Star Safety rating but with upgrades. Premium details like a fidlock® magnetic buckle, Anti-Microbial Quick Dry comfort liner, dual density EPS and more make Flowline SE the premium choice for any rider looking to hit their local trails or cruise the streets on their e-bikes.

SPECIFICATIONS
  • 3-Way adjustable screwless visor
  • NTA-8776 certified for E-Bike usage
  • MIPS B-Series Rotational Impact Brain Protection System
  • Full 360-degree fit retention system with 3-way rear height adjustment
  • 14 vents for maximum airflow
  • Full wrap in-mold construction
  • Extended Coverage MTB Trail Helmet
  • Fidlock® Magnetic Buckle System
  • Dual Density EPS for low and high-speed impacts
  • Anti-microbial Quick Dry Premium Liner
  • Side strap adjusters
  • 5-Star Virginia Tech safety rating

You May Also Like

Mattress Ortho-Coil™Super Firm Support Innerspring by Drive
Mattress Ortho-Coil™Super Firm Support Innerspring by Drive

$ 39.93

Save: $

Disney Minnie Mouse Daisy Duck Plush A-line Slippers
Disney Minnie Mouse Daisy Duck Plush A-line Slippers

$ 15.39

Save: $

Playmate Boys Briefs Blue Tencel Modal
Playmate Boys Briefs Blue Tencel Modal

$ 43.86

Save: $

'Terra FI LITE' men's sandal - Brown
'Terra FI LITE' men's sandal - Brown

$ 89.99

Save: $

KLIM SOLSTICE SHIRT 1.0
KLIM SOLSTICE SHIRT 1.0

$ 34.99

Save: $

Slippers
Slippers

$ 25.83

Save: $

White Comfy Flip Flops Mens 0151126
White Comfy Flip Flops Mens 0151126

$ 38.28

Save: $

Next Level 10.5-inch Short
Next Level 10.5-inch Short

$ 45.50

Save: $

Ulele - Hunter / Aloha
Ulele - Hunter / Aloha

$ 90.00

Save: $

PARTHA Toe-Post Men's Sandal
PARTHA Toe-Post Men's Sandal

$ 48.92

Save: $

Cart
Hot New Arrivals:Anti-Microbial&Lightweight Footwear
Your cart is currently empty.